Practice Production Planning and Control (PPC) MCQs designed for engineering students and competitive exam aspirants. This category covers important topics like production scheduling, inventory control, forecasting, quality control, and operations management. Improve your understanding with concept-based questions, boost accuracy, and prepare effectively for exams, interviews, and placement tests. Ideal for Mechanical Engineering students and govt exam preparation.

Q1. Production Planning and Control mainly deals with?

Correct Answer: B

PPC ensures smooth and efficient production operations.

Q2. Which of the following is the first step in PPC?

Correct Answer: D

Planning is the initial step of PPC.

Q3. Routing in PPC refers to?

Correct Answer: B

Routing defines the path of workflow.

Q4. Scheduling determines?

Correct Answer: B

Scheduling fixes timing and sequence of operations.

Q5. Dispatching is associated with?

Correct Answer: A

Dispatching releases orders for production.

Q6. Follow-up in PPC ensures?

Correct Answer: B

Follow-up helps track and control production progress.

Q7. Gantt chart is used for?

Correct Answer: B

Gantt chart is widely used for scheduling activities.

Q8. Which PPC function decides plant capacity?

Correct Answer: B

Loading matches jobs with machine capacity.

Q9. Work study is used for?

Correct Answer: B

Work study aims to improve productivity by analyzing work.

Q10. Production control ensures?

Correct Answer: A

Production control ensures timely delivery and quality.

Q11. Which of these is a production system?

Correct Answer: A

Batch production is a type of production system.

Q12. Mass production is suitable for?

Correct Answer: B

Mass production works for high-volume products.

Q13. Job production deals with?

Correct Answer: A

Job production focuses on unique customized products.

Q14. Which tool is used for work measurement?

Correct Answer: A

Time study uses stopwatch for work measurement.

Q15. The main objective of PPC is?

Correct Answer: B

PPC optimizes all production resources.

Q16. Economic Order Quantity (EOQ) is related to?

Correct Answer: B

EOQ decides optimum quantity of material ordered.

Q17. Lead time is the time between?

Correct Answer: A

Lead time is duration between placing and receiving order.

Q18. The purpose of ABC analysis is?

Correct Answer: A

ABC analysis classifies inventory based on value.

Q19. PERT chart is used for?

Correct Answer: B

PERT is a project planning and control tool.

Q20. The term JIT stands for?

Correct Answer: B

JIT reduces inventory by producing only when needed.

Q21. Kanban is a?

Correct Answer: A

Kanban is a visual scheduling system.

Q22. Break-even point occurs when?

Correct Answer: A

The break-even point is the stage where total revenue equals total cost, resulting in neither profit nor loss. At this point, a business covers all its fixed and variable expenses through sales. It is an important concept in business and accounting because it helps companies determine the minimum sales needed to avoid losses. Managers use break-even analysis for planning production, pricing products, and making financial decisions. Understanding the break-even point helps businesses improve profitability and maintain financial stability in competitive markets and industries.

Q23. A bottleneck in production means?

Correct Answer: B

Bottleneck is the slowest process limiting productivity.

Q24. Work-in-progress (WIP) refers to?

Correct Answer: B

WIP includes items in different stages of production.

Q25. Which production system is most flexible?

Correct Answer: C

Project production is highly flexible for unique tasks.

Q26. MRP stands for?

Correct Answer: A

MRP helps in planning materials required for production.

Q27. Process layout is preferred for?

Correct Answer: A

Process layout suits job shops with high variety.

Q28. Product layout is mainly used in?

Correct Answer: B

Product layout suits continuous flow or assembly operations.

Q29. Forecasting helps in?

Correct Answer: A

Forecasting predicts future demand.

Q30. Safety stock is kept to avoid?

Correct Answer: B

Safety stock prevents shortage due to demand variation.

Q31. Routing sheet contains?

Correct Answer: B

Routing sheet lists the operation flow.

Q32. Line balancing aims to?

Correct Answer: B

Line balancing reduces worker idle time.

Q33. Production control ensures?

Correct Answer: B

Production control ensures timely completion of tasks.

Q34. Inventory turnover ratio indicates?

Correct Answer: B

Inventory turnover shows how often inventory is consumed.

Q35. Standard time includes?

Correct Answer: B

Standard time includes basic time plus allowances.

Q36. Poka-yoke concept is used for?

Correct Answer: B

Poka-yoke prevents mistakes in manufacturing.

Q37. Lean manufacturing aims to remove?

Correct Answer: A

Lean manufacturing eliminates all types of waste.

Q38. SMED is related to?

Correct Answer: A

SMED stands for Single Minute Exchange of Die.

Q39. Which one is NOT a type of production planning?

Correct Answer: C

Customer planning is not part of PPC.